Revin | |||||
---|---|---|---|---|---|
Lat | 49° 54' 60'' N | ||||
Long | 04° 38' 29'' E | ||||
Altitude | 395 m | ||||
Contact | Stéphane SAUVAGE, Ecole des Mines de Douai, stephane.sauvage(at)mines-douai.fr |
Instrument | Parameter | Time resolution | Status | |
---|---|---|---|---|
Optical measurement | Aethalometer 2-Lambda (370 and 880 nm) | BC concentration | ~5 min | 25 June -12 July (if available) |
Size distribution | TEOM FDMS | PM10 mass | ~5 min | running continuously |
TEOM FDMS | PM1 mass | ~5 min | 25 June - 12 July | |
SMPS Grimm | N dist (10-1000 nm) | ~5 min | 25 June - 12 July | |
Aerosol chemistry | HR-ToF-AMS (Aerodyne) | PM1 chemical composition and size distribution | ~5 min | 25 June -12 July |
DA80 (PM10) | ions, EC/OC, sugars, organic acids, organic speciation (PAH, hopanes/steranes, tetrols, etc.), HULIS,... | daily | 8 June -12 July | |
LVS Partisol+ (PM10) | Mineral dust with the PIXE/XRF method | daily | 8 June -12 July | |
Gas phase chemistry | Off-line adsorbent and DNPH cartridges | BTEX, terpenes, alkanes (C9-C16), Aldehydes (C6-C13), OVOC C1-C7 | 3h | 25 June -12 July |
Partisol speciation + denuder filterpack Chemcomb (PM10) | NH3, HNO3, SO2 + inorganic species | daily | 8 June -12 July | |
TEI42iTL + Blue Light Convertor | NOx, NO2 | 5 min | running continuously | |
Automated monitoring | CO, CO2 | 5 min | 25 June -12 July | |
Automated monitoring | O3 | 5 min | running continuously | |
Met station | T, RH, WS, WD | running continuously |