Projects

Closing of the SINQ neutron guide bunker during the SINQ Upgrade project in April 2020.

Please use the links below to find out more about current and past projects which were led by LIN or to which we provided major contributions.
 

SINQ Upgrade Guides

SINQ Upgrade Project (completed)

The SINQ Upgrade was started with a planning and design phase in 2016, with the aim of substantially improving the neutron flux and enabling the study of much smaller sample cross-sections. In the period from January 2019 to August 2020, all seven neutron guides feeding the instruments in the neutron guide hall have been replaced entirely. Moreover, improved shielding for fast neutrons has been installed in the neutron guide bunker to enhance the signal-to-noise ratio. Flux gains ranging from 2–30 depending on the instrument were achieved in excellent agreement with the design specification obtained in simulations.