Beamline Status

Ressource Status Description
Status optics and monochromator OK Beamline optics 80% commissioned
Status sample and environment OK Measurement conditions: 7T-2T magnetic field, 2K.
In-situ preparation chamber available
Status endstations and detectors OK End-station in operation.
Detection mode: Total electron yield. If requested, total fluorescence yield or transmission can be acquired in parallel to TEY.
Status analysis tools OK Basic tools for analysis
Status operation OK Fully open to users
Legend OK PROBLEMS ERROR
Date Description
Oct/2008 Start beamline construction
Oct/2009 First light
Jul/2010 End-station delivered and acceptance test complete
2011 Pilot Experiments
2012-2013 Beamline partially open for users
since Jan/2014 Beamline fully open to users