We have installed the data acquisition hardware and cabling needed for early Mu3e running at PSI. The fibre fan-out rack, which serves as a switch-yard for TBits/s of data as well as clock, reset and configuration lines is fully set up. A first version of the filter farm and the switching PCs moving the data to the farm have also been installed.
Prof. André Schöning