X03DA-ES-PS1-002-600x200.jpg

Status

Expected status of the facilities for the next half year (updated 2024-08-01). Availability of facilities subject to change without notice for technical reasons. Please ask if you have specific requirements.

As the SLS is undergoing a major upgrade since October 2023, no synchrotron light is available at PEARL until the new beamline opens in 2026. In the meantime, the PEARL endstation (sample preparation, STM, XPS/ARPES with lab source) remains operational. Please ask beamline staff if you have any requests for experiments at PEARL.

Facility

Status

Notes

Sources

Synchrotron radiation

not available

SLS upgrade

He Iα, He IIα (monochromatized)

ask

commissioning

Mg Kα, Si Kα (unmonochromatized)

ask

commissioning

Photoelectron Spectroscopy (XPS/XPD/PhD/ARPES)

Electron spectrometer (Scienta DFS30)

ask

 

Angle scans

ask

 

Photon energy scans

not available

SLS upgrade

ARPES, Fermi surface mapping

ask

 

Manipulator cooling

ask

35 K

Temperature programming

ask

T < 500 K

Operando measurements

ask

 

Remote control

not available

 

Scanning Tunnelling Microscopy (STM/STS)

Microscopy (Omicron LT-STM, Nanonis control system)

OK

 

Spectroscopy

OK

 

Sample temperature

OK

4 K, 77 K

Remote control (scanning only)

ask

 

AFM (ex situ)

ask

 

Sample entry

Fast entry lock

OK

 

Glove box transfer

ask

 

Sample preparation

Ar sputtering

OK

 

Heating, radiative

OK

1200 K

Heating, direct current

OK

12 A

Heating, e-beam

OK

1500 K

Pyrometer

OK

 

Cooling

OK

90 K

Organic multi-evaporator

OK

900 K

Accessory ports

OK

2 ports

LEED/Auger

OK

 

QMS/RGA

OK

 

Gas dosing

OK

Messer CANgas

Chemistry lab access

ask

 

Sample preparation, STM system

Ar sputtering

OK

 

Heating, radiative

OK

1200 K

Cooling

OK

140 K

Accessory ports

OK

2 ports